2nd Street Improvements

The 2nd street improvements consisted of installing curb and gutter and widening the existing street.  In addition to street widening, the existing HMA street was overlaid to provide a new roadway surface and provide additional strength.  Intersection radius's were also widened around the school to allow for turning bus traffic.  This project also included storm sewer upgrades in the area and installation of pedestrian sidewalk ramps.

Sample Photo

2nd Street Improvements

 

 

 

Project Summary

  • Length = 950 LF
  • Total Cost = $243,838.98
  • Completed: 2010