Iowa State University Seed Science Building Expansion

CGA partnered with Studio Melee Architects on improvements to the Seed Science Building on the ISU campus in 2020. Site improvements included parking lot reconfiguration, ADA access upgrades, and storm sewer modifications. CGA provided services from schematic design through construction. Project Manager: Mindy Bryngelson CGA’s Role Included: Topographic Survey Storm Sewer Analysis ADA Compliance Review…

Collegiate United Methodist Church Annex Improvements

CGA worked with the CUMC Board, maintenance staff, and tenants to improve drainage and lower accessibility to the churches Annex building in Campustown Ames. Several options were presented to the advisory committee to eliminate drainage concerns and slip hazards on the north side of the site with special attention to the tight budget. Extensive storm…

U.S. Economic Development Administration Preliminary Engineering Report | ISU Research Park, Ames, IA

CGA was the Project Manager for the development of the Economic Development Administration Preliminary Engineering report for ISU Research Park improvments, including preliminary design components and cost estimates. In addition to the Project Overview, the report included a Feasibility Analysis showing Required Permitting, a bid package for a Public Utility Extension as well as Roadway…

Celebrations | Ames, IA

CGA was the Design Engineer on the design-build of a new building at an existing site in Ames, including site layout, grading, and utilities; design of a bioretention cell; design of a custom multi-tank storage system with staged outlet to provide quantity and quality stormwater storage per the existing City of Ames code; preparing the…