Direct Appliance Warehouse Expansion | Cedar Falls, IA
CGA assisted with the site design for a new building connection, retaining walls, storm improvements, and dock at Direct Appliance in Cedar Falls.
CGA assisted with the site design for a new building connection, retaining walls, storm improvements, and dock at Direct Appliance in Cedar Falls.
CGA worked with Scooter’s Coffee’s architects to develop a site plan at 412 West 1st Street in Cedar Falls, IA for a new specialty coffee establishment that opened in 2021 – the first Scooter’s Coffee in the Cedar Valley! CGA site design elements included: 8-stall Parking Lot Drive-through Storm Sewer Sanitary Sewer Storm Water Paving…
CGA is providing construction staking services during this phased construction project on a major intersection in Cedar Falls. Having been labeled as one of the deadliest intersections in the state of Iowa, The Iowa Department of Transportation’s Iowa 58 (IA 58) and Viking Road Interchange Construction Project began in 2018 and is scheduled to be…
CGA worked with the Raising Cane’s architects to develop a site plan off of Viking Road and Highway 58 in Cedar Falls, IA for a new fast-food restaurant that opened in 2019. In addition to the land development and site plan, CGA also provided construction staking services as well as construction administration.
CGA partnered with InVision Architects to complete the site design for the new $10 million dollar Cedar Falls Police and Fire Headquarters on the south side of Cedar Falls in the Prairie Business Park. The project includes a 22,000 SF addition onto the existing fire station, a 20-stall visitor parking lot, 67-stall access controlled employee…
CGA provided project management for a private commercial development planned for an undeveloped area consisting of open farm fields in Cedar Falls. In planning and design for the 50-acre commercial development, the City requested that the area is accommodating to all future development within the watershed. In total, CGA studied 105-acres and developed a comprehensive…
The Arbors, located on Viking Road, one-half mile north of Hudson Road in Cedar Falls, Iowa needed stormwater management from scratch due to a new residential development being built. The project included extensive site grading, construction of stormwater management areas, PCC pavement as well as water and utilities. CGA has provided the layout for Public…
CGA was hired by the City of Cedar Falls to perform traffic projection reviews, analyze signalization versus roundabouts at key intersections, and recommend access management alternatives along the corridor. CGA met with key stakeholders and developers along the corridor to understand their future plans so that win-win solutions could be achieved. The result was a…