Somerset Pond Rehabilitation | City of Ames
The City of Ames has experienced localized flooding in various areas around the city including in the Somerset area. CGA modeled stormwater flowing to the Somerset detention basin along GW Carver and measured the amount of silt that had accumulated in the bottom of the pond over the years. The final design included silt removal,…