Skip to content
Facebook page opens in new windowLinkedin page opens in new windowInstagram page opens in new windowYouTube page opens in new window
16 East Main St. #400, Marshalltown, IA 50158(800) 542-7981
  • Recent Projects
  • CGA Blog
  • Press Releases
  • Bid Info
Secondary Menu
Clapsaddle-Garber Associates
Civil engineer in Marshalltown, Iowa
Clapsaddle-Garber AssociatesClapsaddle-Garber Associates
  • Engineering Services
    • Ag Drainage
    • Aviation
    • Construction Administration & Observation
    • Land Development
    • Natural & Water Resources
    • Streets & Transportation
    • Testing / Lab
    • Water / Wastewater
    • Other Services
  • Land Survey Services
    • ALTA/NSPS SURVEYS
    • Boundary / Property Surveys
    • Topographic / Mapping
    • Construction Survey, Staking & Locates
    • Transmission Line Survey
    • Other Services
  • Planning, Design & Other Services
    • GIS Services
    • Grant & Funding Assistance
    • Municipalities & Governmental
    • Planning
    • Right of Way / Property Acquisition
    • Site/Civil Design
    • Structural Design
    • Other Services
  • About
    • Our Team & Qualifications
    • Locations
  • Careers
  • Contact
Search:
  • Engineering Services
    • Ag Drainage
    • Aviation
    • Construction Administration & Observation
    • Land Development
    • Natural & Water Resources
    • Streets & Transportation
    • Testing / Lab
    • Water / Wastewater
    • Other Services
  • Land Survey Services
    • ALTA/NSPS SURVEYS
    • Boundary / Property Surveys
    • Topographic / Mapping
    • Construction Survey, Staking & Locates
    • Transmission Line Survey
    • Other Services
  • Planning, Design & Other Services
    • GIS Services
    • Grant & Funding Assistance
    • Municipalities & Governmental
    • Planning
    • Right of Way / Property Acquisition
    • Site/Civil Design
    • Structural Design
    • Other Services
  • About
    • CGA Blog
    • Press Releases
    • Our Team & Qualifications
    • Locations
  • Careers
  • Contact
    • Bid Info
  • Recent Projects
ZoomDetails

Leversee Road Lift Station | Waterloo, Iowa

Construction Administration, WastewaterBy Stephanie RottinghausAugust 25, 2022

The City of Waterloo extended sewer, water, and electrical utilities to serve the new Waterloo Air and Rail Park industrial park, which was developed on the west side of Leversee Road near the airport. As part of this development, a new lift station to extend wastewater services to the area was installed. CGA provided design…

ZoomDetails

Hwy 61 Staking | Des Moines County

SurveyBy Stephanie RottinghausOctober 18, 2021

CGA was hired to perform the construction staking on this two-year pavement improvement project that stretches from Burlington to the north of Mediapolis on U.S. 61 in Des Moines County.

ZoomDetails

Highway 20 Reconstruction | Waterloo, Iowa

SurveyBy Stephanie RottinghausJune 16, 2021

CGA provided construction staking for an Iowa Department of Transportation (IDOT) road reconstruction project along Highway 20 in Waterloo, stretching three miles from U.S. Highway 63 (Sergeant Road) to Iowa Highway 21 (Hawkeye Road). Crews removed and replaced pavement along a three-mile stretch with construction completed in November 2021.

ZoomDetails

WARP Drive, New Road | Waterloo, Iowa

Construction Administration, Design, Grants, StreetsBy Stephanie RottinghausMay 5, 2021

An Iowa DOT grant-funded project was completed to develop a new industrial park to capitalize on a network of highways, railways, and runways west of the Waterloo Regional Airport. The City of Waterloo extended water main and sanitary sewer to serve these new commercial lots as well as rail services. Division 1 included 1100 feet…

ZoomDetails

Auestad Avenue IDOT Rise | Story City

Construction Administration, StreetsBy Stephanie RottinghausFebruary 17, 2020

Story City’s I-35 Business Park is a city led development on the east side of I-35 north of Ames. CGA has worked with Story City over the past 20 years on development of the site over several phases to accommodate new industrial businesses to grow the communities’ tax base. Each project phase in the park…

ZoomDetails

Marshalltown High School Phase I and II Roundhouse Addition

Design, Natural & Water Resources, StreetsBy Stephanie RottinghausJanuary 31, 2019

CGA reconfigured the existing Marshalltown High School Loading dock with the phase II Roundhouse improvements. The existing dock wall and pavement were removed and replaced to accommodate a new exterior door to allow the dock ramping to be placed within a new garage. The original storm sewer trench drain was replaced and routed to the…

ZoomDetails

Industrial Park RISE | Ackley, IA

Grants, StreetsBy Stephanie RottinghausOctober 4, 2018

Once the lots with existing road access in Ackley’s Industrial Park had sold, installation of a roadway became necessary to continue lot sales. CGA worked with the City of Ackley to complete a successful IDOT RISE application. This application funded up to half of the storm sewer and paving costs for the project. A roadway…

ZoomDetails

Butler Street Repaving and Storm System | Ackley

Natural & Water Resources, StreetsBy Stephanie RottinghausAugust 8, 2018

Butler Street in Ackley has historically experienced flooding and over-topping during heavy rain events. As a result, the City of Ackley authorized a feasibility study for repairs and improvements to the Butler Street watershed. Based on the study, it was determined that although it was warranted, a totally new storm water conveyance system was not…

Copyright © 2023, All rights reserved.
  • Lab Testing
  • Resources
  • Bid Info
Bottom Menu

Website design by Running Robots
Terms and Privacy Policy  |   Website Login

Go to Top