Humboldt Municipal Airport
RECENT AIRPORT IMPROVEMENT PROJECTS Construct SRE Building | 2019 Improve Fencing | 2018 Acquire snow removal equipment | 2017 Airport Master Plan update | 2015-2016
RECENT AIRPORT IMPROVEMENT PROJECTS Construct SRE Building | 2019 Improve Fencing | 2018 Acquire snow removal equipment | 2017 Airport Master Plan update | 2015-2016
RECENT AIRPORT IMPROVEMENT PROJECTS: Apron Expansion | 2019 Relocate fuel system | 2017-2019 Master Plan Update | 2016, 2018 Construct stormwater retention | SRE storage building construction | 2015
RECENT AIRPORT IMPROVEMENT PROJECTS Install Wind Cone | 2019 Turnaround Construction | 2017-2018 Install PAPI and REILS | 2016 Land acquisition and minor ALP revisions | 2015
RECENT AIRPORT IMPROVEMENT PROJECTS Replace Beacon | Taxiway Reconstruction Design | 2019 Security lighting | 2018 Construct hangar, paving improvements | Apron reconstruction-Phase II | 2017 Replace REILS, security lighting | 2015
RECENT AIRPORT IMPROVEMENT PROJECTS Snow Removal Equipment Acquisition | 2019 Replace fuel/AV gas cabinet | Environment assessment | 2017 Beacon replacement | 2016 Runway 16/34 rehabilitation design | 2014-2015
RECENT AIRPORT IMPROVEMENT PROJECTS Hangar/Terminal Design | 2019 Rehabilitation of runway end 18 and connecting taxiways | 2017 Hangar floor replacement | 2017 Hangar floor replacement | 2015
CGA was the Design Engineer on the design-build of a new building at an existing site in Ames, including site layout, grading, and utilities; design of a bioretention cell; design of a custom multi-tank storage system with staged outlet to provide quantity and quality stormwater storage per the existing City of Ames code; preparing the…
CGA worked with the Raising Cane’s architects to develop a site plan off of Viking Road and Highway 58 in Cedar Falls, IA for a new fast-food restaurant that opened in 2019. In addition to the land development and site plan, CGA also provided construction staking services as well as construction administration.
RECENT AIRPORT IMPROVEMENT PROJECTS Rehabilitate Runway, Apron and Taxiway | 2019 Replace Electrical Vault | 2018 Rehabilitate Runway Lighting and Rotating Beacon | 2017
CGA partnered with TSP Architects on the Dack Hall expansion and was subsequently hired to make improvements to Memorial Drive. The team worked to improve drainage in the area, provide a covered bus loading/unloading for Dack Hall, and bring pedestrian access within ADA standards. After removing the original pavement the subsoils were explored and found…