CGA was the Design Engineer on the design-build of a new building at an existing site in Ames, including site layout, grading, and utilities; design of a bioretention cell; design of a custom multi-tank storage system with staged outlet to provide quantity and quality stormwater storage per the existing City of Ames code; preparing the Storm Water Drainage Report for City approval; coordination with the city, owner, and contractor; construction administration; and As-Built submittal for the storm facilities on site for final approval.