CGA worked with the CUMC Board, maintenance staff, and tenants to improve drainage and lower accessibility to the churches Annex building in Campustown Ames. Several options were presented to the advisory committee to eliminate drainage concerns and slip hazards on the north side of the site with special attention to the tight budget. Extensive storm sewer examination was conducted, including basement and roof area, pipe flushing, as well as video inspection.
Project Overview
Parking Lot Curbing
Drive Removal
New Sidewalks
New Ramps
New Stairs
New Stoops
New Turf
Native Seeding
Storm Sewer Examination
Pipe Flushing
Video Inspection