CGA reconfigured the existing Marshalltown High School Loading dock with the phase II Roundhouse improvements. The existing dock wall and pavement were removed and replaced to accommodate a new exterior door to allow the dock ramping to be placed within a new garage. The original storm sewer trench drain was replaced and routed to the sanitary sewer as required by code. The original building plans were studied and exploratory digging was completed during design to relocate existing utilities to remain.
CGA’s role included stormwater management BMPs, public and private sanitary, private storm sewer and water service, public roadway, private access roads, reconfigured loading dock, parking lot improvements, new building entry plazas, grading and setting multiple building floor elevations, coordination with the owner, architects, and contractor.