The CGA team designed site improvements and administered construction for a new hospital on the south side of Marshalltown. The project was built in two construction packages over a 15-month period. Our team successfully presented cost-effective solutions for challenging soils and worked side-by-side the Geotechnical Engineer and contractor during construction to provide a subgrade bridging solution to ensure pavement longevity.

Project Overview

Stormwater management BMPs
Public and private storm, sanitary, and water utilities
Public roadway
Private access roads
Loading docks
Patient drop-off areas
Ambulance access
276 stalls within two parking lots
Grading and setting multiple building floor elevations
Coordination with the owner, architects, and contractor

Click Here to View Traffic Study Components