The CGA team designed site improvements and administered construction for a new hospital on the south side of Marshalltown. The project was built in two construction packages over a 15-month period. Our team successfully presented cost-effective solutions for challenging soils and worked side-by-side the Geotechnical Engineer and contractor during construction to provide a subgrade bridging solution to ensure pavement longevity.
Project Overview
Stormwater management BMPs
Public and private storm, sanitary, and water utilities
Public roadway
Private access roads
Loading docks
Patient drop-off areas
Ambulance access
276 stalls within two parking lots
Grading and setting multiple building floor elevations
Coordination with the owner, architects, and contractor