CGA assisted the City of Story City with the reconstruction of Broad Street from Grand Ave to Garfield Ave, Elm Ave from Maple St. to Oak St., and a few others. This included new pavement with ADA stalls, striping, sidewalks with ADA ramps, and utilities. The project scope included a topographic survey, design, and construction observation.














